Hello.
I know, the question was asked a dozen times. But no solution seems to work for me.
I have a cutting job. Just cutting, no engraving.
The estimate says the job will take about 33min. The Job actually took 16min
Another Job was estimated at 15min and took 2min 30s.
I found the advanced setting window where I can read parameters from the controller, which is working. (I changed some settings, clicked “Read from controller” and the values were updated)
But the estimated time is still way off.
I tried to change the “Cut Speed Scale” and “Global Speed Scale” to 200%
The job estimate went down from 33 min to 31min. so no big change.
on 500% the time estimate is still 31min.
in the preview window it says, the total cut length is 14108mm
my layer is set to 15mm/s
if i divide 14108mm / 15mm/s ~ 940s
which are about 15.67 minutes, which are much much closer to the real time it took to cut my job.
I know, that this time is lower because of accelearation and movement to the next object and so on.
I’m on LightBurn version 1.4.05